Summersville Reservoir
October 7, 2012 by staff
Summersville Reservoir, The lake was constructed between 1960 and 1966 by the United States Army Corps of Engineers in order to control flooding in an 803-square-mile (2,080 km2) watershed along the Gauley River and the Kanawha River. At 390 feet (120 m) tall, 2,280 feet (690 m) long, and containing 12,000,000 cubic yards (9,200,000 m3) of dirt and rock, the dam itself is the second-largest rock-fill dam in the Eastern United States.
President Lyndon B. Johnson dedicated both the dam and a new Summersville Post Office on September 3, 1966.
The US Corps of Engineers broke a long-standing tradition in naming what was called the Summersville Project. Tradition holds that the project will be named after the town nearest the site of construction, unless named for a person (such as Hoover Dam). However, the town of Summersville was not the one nearest the dam. The village of Gad (located near the present-day marina) was literally flooded at the opening of the reservoir. After briefly considering the name “Gad Dam,” it was instead decided to name the project after the next nearest town – Summersville.
_________________________________________
Please feel free to send if you have any questions regarding this post , you can contact on
Disclaimer: The views expressed on this site are that of the authors and not necessarily that of U.S.S.POST.


Comments