Caltrans Cameras, Caltrans and the contractor Tutor Saliba continue to work on the bridge replacement project Antlers during the winter months. The $ 125 million project is funded with federal transportation money and the state through the State Highway Operation and Protection Program.

This project will replace Antlers Bridge on Interstate 5 in Shasta County on the Sacramento River arm of Shasta Lake near the community of Lakehead. The new structure will be 1,942 feet long, the bridge 104 feet wide concrete, and five bays. It will be built on a new alignment parallel to slightly east of the existing bridge. In addition, Article 0.4 mile long southern highway bridge will be realigned and the existing structure 1,330 feet long will be demolished and removed.

Tutor Saliba just completed the construction of the pillar 6 located on the north shore of the lake and close to 25% with a pillar on the south side. All excavation is done for the season after moving 162,000 cubic yards (16,000 truckloads dump) of the land last summer to make way for the new alignment. Much of the material is stored temporarily on the north shore of the lake beside the highway and will be used later for the decommissioning of the old alignment and re-contour trails former size.

The contractor has made progress on three different trestles they need to build the foundations of the bridge. A trestle is complete, it is half finished and the last is just beginning. They are currently working outside the completed bridges foundation construction at Pier 5, located along the northern edge of the lake. Recent efforts have been directed towards maintaining the site to minimize erosion now that winter is near.

Two cameras were recently installed building that will provide real-time images of work progress. The cameras take pictures every 15 minutes and download them to a website hosted by Earthcam. The images are archived and referenced to the corresponding date and time. The cameras can be found on the Caltrans District 2 website at:

Travel will be restricted to two lanes in both directions north and south during the winter months. The temporary concrete barrier will remain in place along the right side of the road through the project limits and work will continue throughout the winter mainly on the foundations of the bridge and access trestle. Boat ramp will remain open Antlers and lake access through the construction zone will be maintained.

Report to Team

Please feel free to send if you have any questions regarding this post , you can contact on

Disclaimer: The views expressed on this site are that of the authors and not necessarily that of U.S.S.POST.


Comments are closed.